yourindustryprofile

White Papers

White Papers

April 25, 2016
  Extended Reach Drilling http://www.hxrdrillingservices.com/wp-content/uploads/HXR_ERD-0715.pdf   Deepwater Drilling http://www.hxrdrillingservices.com/wp-content/uploads/HXR_DWD_0715.pdf   Directional and Horizontal Drilling http://www.hxrdrillingservices.com/wp-content/uploads/HXR_DHD_0316.pdf   Vertical Drilling http://www.hxrdrillingservices.com/wp-content/uploads/HXR_VD_0316.pdf   ERDPro Engineering Software http://www.hxrdrillingservices.com/wp-content/uploads/HXR_ERDP_0715.pdf   DEEPWATERPro Pore Pressure Evaluation Software http://www.hxrdrillingservices.com/wp-content/uploads/HXR_DWP_0715.pdf   Well Stability…
Aquasign

White Papers

August 19, 2014
Aquasign do not have any White Papers at the moment. To find out more about Aquasign, please visit http://www.aquasign.com
Inductotherm Heating & Welding Ltd. has full ISO 9001 Certification. Inductotherm ISO 9001:2008 Quality Certificate Inductotherm Heating & Welding are also members of the following industry associations:  

QHSE

August 04, 2014
"Key to CIS's performance is our unremitting commitment to providing a safe working environment" CIS has the NQA triple crown award in Quality, Health and Safety and the Environment. These standards are embedded into…

OTDR Event Analysis

April 10, 2014
Introduction Data center, enterprise, and FTTx fiber networks present a number of challenges when it comes to locating and measuring eventsand impairments. These challenges include multiple connectors and splices in each fiber, numerous short…
Reliable fiber-optic communications in high-radiation environments such as linear accelerators and nuclear reactors is made possible by silica fibers with optimized fluorine-doped cores. READ MORE>
Click here to view

Cable Wrapping Tapes

April 21, 2014
Click here to view

Quality Statement

December 09, 2014
SACO AEI Compounds Limited has adopted and introduced a business management system that is based upon the EN ISO 9001:2008 business management model. The management system has been designed to reflect our commitment to…
Modern marketing rhetoric claims that, in order to cut out expensive costs and reduce risks during the design and construction phase of major capital projects, we must ensure that the plant design is completed…
Page 2 of 3