Case Study

January 07, 2016
Apache North Sea Forties Project   Introduction Tata Steel helped oil and gas company Apache North Sea win a race against time by delivering urgently needed coated line pipe as part of the customer’s…
CIS have successfully completed a number of conductor installations in the Southern North Sea from their operating base in Great Yarmouth. These have included the installation of 36inch x 2inch jacket docking piles through…
Westermost Rough Project – A Case Study Route preparation and boulder clearing project on Westermost Rough Wind Farm. 33 routes cleared in high currents on spring as well as neap tides. 20m corridor required.…
CIS has worked extensively in Malaysia – most recently on the installation of a 36” x 1” conductor from an Ensco Jack Up. Since the company began trading in 2005 we’ve worked with several…
The Romanian oil and gas producer Petrom needed to guide a new conductor away from existing platform conductors. CIS aided the installation process by using a bespoke deviated directional drive shoe. This avoided a…
AFL participated in a year-and-a-half long middle school renovation project in Charlotte, NC, which included replacement of the entire voice/data cabling infrastructure, a new CATV distribution system and cabling of a new 10-classroom science building addition. READ…
AFL completed multiple site visits to support hardware and system conversion activities related to converting existing legacy Wachovia retail branches to Wells Fargo go forward systems. READ MORE >
CIS provided personnel and an S-90 hammer to assist in a drive-drill-drive project that consisted of installing thirty 1056mm OD piles for the extension of an existing fuel terminal in Panama. While six of…
Osiris Projects were commissioned to carry out a Multi-Channel Seismic survey in Christchurch Bay. The main objective of the survey was to provide the Client with high resolution Multi-Channel seismic data along ten supplied…

Monitoring Survey

March 27, 2014
North Hoyle Offshore Wind Farm The main objectives of the surveys were as follows: Survey of 1200m wide corridor for long term monitoring of sand wave migration.  Side scan imagery also to be used…