Intergraph_CADWorx_CaseStudy_Gelsia_Italy_Final_SCREEN.pdf   CaseStudy-TheBadgerCompany_CADWorx_fieldPipe_FINAL_SCREEN.pdf   CaseStudy_-_MARSON_3D-ISAGRO_SCREEN_FINAL.pdf   Case_Study_GazpromNeftOmsk_final.pdf   EnBW_Casestudy_FINAL.pdf   CaseStudy-_ECOFOX_Final.pdf   Intergraph_CADWorx_CAESAR_II_CaseStudy_SAFE_Final.pdf   Case_Study_NEOLANT_SCREEN.pdf   Mahler_CaseStudy_CADWorx_CAESARII_SCREEN.pdf   Case_Study_LUDAN_FINAL_WEB.pdf   CaseStudy-_Nortech-FINAL_SCREEN.pdf   OnLineDesignEngineering_CaseStudy_CAESARIIPV-Elite_NozzlePro_SCREEN.pdf    
In a full turnkey operation for a conductor installation project in Tunisia for Houston-based Atlas Petroleum Group, CIS provided engineering assistance (in collaboration with a fellow Acteon company) and provided and installed three strings…
The survey area is located approximately 35 km offshore to the west of Fleetwood, Lancashire. The combined fields cover an area of just over 700 km2, with three routes feeding back to shore at…
The proposed wind farm lies 8km east of Spurn Head, with water depths on site ranging from 10.0 m below CD to 17.0 m below CD. The main objective of the seabed features survey…
The survey area comprised of twenty separate locations to provide information for route development for broadband fibre-optic cable installation. The main objectives of the survey were as follows: To acquire side scan sonar, multibeam…
The Conwy field and surrounding prospects are located in the East Irish Sea approximately 12km to the North West of the existing Douglas platform. The main objectives of the surveys were as follows: A…
CIS recently completed a very demanding project in Australasia. The project was in a remote jungle location and involved the installation of some sixty 48-in. and ninety 18-in. steel foundation piles for two wharfs…
  CIS have provided technical support personnel to assist in the driving of conductors in 21 slots in Azerbaijan. The majority of these installations have utilised our S-150 hammers driving 30inch x 1.5inch pipe.…
What applications did Bibby have in mind when they purchased the Atom? Although primarily the Atom has been aimed at the light construction market, Bibby intend to cover survey, drill support and IRM with…
CIS have provided technical support personnel to assist with the driving of piles for a jacket installation offshore Turkey. Two 42inch x 1.5inch piles were driven with a S-150 hammer as part of a…