yourindustryprofile

Case Studies

BG Group India has been working with CIS since the company was founded in 2005. In the intervening time, CIS has carried out over 80 projects the company – all of which have been…
Faced by a rapid increase in mobile data traffic, Swiss mobile operators have modernised thousands of antennas and upgraded to 4th generation mobile communication. Many of these antennas are equipped with components from HUBER+SUHNER.…
AFL completed multiple site visits to support hardware and system conversion activities related to converting existing legacy Wachovia retail branches to Wells Fargo go forward systems. READ MORE >
Fibre optic telecommunications and digital technology is used by power utility companies for monitoring and securing the power network to guarantee consistency in electricity transmission provision. French power utility company, RTE, wanted to ensure…
In March 2008 an operating company based in Vietnam asked CIS to provide them with seven drive shoes for their upcoming conductor driving campaign after their normal supplier was not able to provide them…
The Romanian oil and gas producer Petrom needed to guide a new conductor away from existing platform conductors. CIS aided the installation process by using a bespoke deviated directional drive shoe. This avoided a…
Advantages of Nylacast Sheaves Using advanced polymers, in particular those based around cast nylon, allow for a number of significant advantages in sheave application. These included increased wire rope life, reduced component weight, protection…
CIS has worked with all of the major operators in Equatorial Guinea during the last few years. During this time we have utilized our bespoke-designed and manufactured land frame to provide a full rigless…

Geophysical Survey

March 27, 2014
The main objective of the survey was to acquire a high resolution data set for the evaluation of aggregate resource assessment prior to geotechnical investigations. This included the acquisition of accurate 100% coverage bathymetry,…

Cable Route Survey

March 27, 2014
The survey area comprised three separate locations. Firstly, the Welsh inshore section of the project, secondly the Irish inshore section and thirdly the route development work. The main objectives of the survey were as…