CIS recently completed a very demanding project in Australasia. The project was in a remote jungle location and involved the installation of some sixty 48-in. and ninety 18-in. steel foundation piles for two wharfs…

Respect

November 17, 2014
As the result of her extensive experience in human resources management, Patricia Stolz is ideally equipped for her tasks at HUBER+SUHNER. As well as specialist knowledge and experience, she also relies on traditional values…
Egyptian Electricity Transmission Company (EETC) suffered fibre breaks on an existing OPGW network which spanned the Suez Canal. The OPGW cable provided a crucial strategic fibre optic link between the main cities of Egypt…
Germany's MEDAV specialises in direction and location finding systems. The company previously used coaxial cables with a weight of up to 900 kg for signal transmission in its positioning systems. A glass-fiber-based solution by…
The proposed wind farm lies 8km east of Spurn Head, with water depths on site ranging from 10.0 m below CD to 17.0 m below CD. The main objective of the seabed features survey…
AFL designed and installed a wireless system plus provided advanced technology and network management services for PATH Transit Systems. The wireless network is used for communication to the train cars from the platforms at…
In a full turnkey operation for a conductor installation project in Tunisia for Houston-based Atlas Petroleum Group, CIS provided engineering assistance (in collaboration with a fellow Acteon company) and provided and installed three strings…
AFL provided an end-to-end turnkey GPON network solution to support this expansive continuous care retirement facility in the Greater Boston area. READ MORE >
SMD has been a leading manufacturer of subsea robotic systems since the 1980s and is well known for producing the world’s most successful trenching machines. In 2003, SMD started manufacturing work class ROVs. This…
Laggan Tormore Project – A Case Study Route preparation and bouldering clearing project. SCAR Seabed System completed a 67km, 10m wide swathe in 6 days operating in water depths greater than 600m. The system…