yourindustryprofile

Case Studies

CIS has successfully completed two installations of 30inch x 1.5 inch conductors for a major international operator in Egypt. Both installations utilised a CIS-designed deep penetration drive shoe. Along with the drive shoes CIS…
AFL completed multiple site visits to support hardware and system conversion activities related to converting existing legacy Wachovia retail branches to Wells Fargo go forward systems. READ MORE >
HUBER+SUHNER has been chosen to supply Thales with a range of trackside and on-board antennas and cables to support the CBTC (Communications Based Train Control) system on the New York City Subway. CBTC enables…
Baltic 2 OWF Project – A Case Study Route preparation, boulder clearing and pre-lay trenching project which has been one of the most successful ever conducted for the wind energy sector. 86 route preparation…
In a full turnkey operation for a conductor installation project in Tunisia for Houston-based Atlas Petroleum Group, CIS provided engineering assistance (in collaboration with a fellow Acteon company) and provided and installed three strings…

Team Spirit

November 17, 2014
Being involved in setting up the new plant in Changzhou in China and being able to make a decisive contribution to the start-up phase: Vicky Xu regards this as representing a unique opportunity. She…
CIS provided a pair of S-150 hammers to assist in the installation of a replacement oil loading and offloading terminal in 90 feet of water offshore Grand Bahama. The ground contained difficult-to-drill hard horizons…
The proposed wind farm is located in the outer Firth of Tay, approximately 15 - 22km east off the Angus coastline.  The objectives of the export cable route survey were to: Determine water depths…
Germany's MEDAV specialises in direction and location finding systems. The company previously used coaxial cables with a weight of up to 900 kg for signal transmission in its positioning systems. A glass-fiber-based solution by…
CIS has successfully completed two conductor driving operations in Cameroon. Both operations utilised the CIS S-90 hammer (mobilised from our extensive fleet)  to drive 30 inch x 1 inch pipe with Drillquip H60N and…