yourindustryprofile

Case Studies

Geophysical Survey

March 27, 2014
The Owers Bank dredging area lies approximately 8 nautical miles offshore Littlehampton on the south coast of England, UK.  The sites surveyed are located within this licensed dredging area and are referred to as…
Laggan Tormore Project – A Case Study Route preparation and bouldering clearing project. SCAR Seabed System completed a 67km, 10m wide swathe in 6 days operating in water depths greater than 600m. The system…
In March 2008 an operating company based in Vietnam asked CIS to provide them with seven drive shoes for their upcoming conductor driving campaign after their normal supplier was not able to provide them…
RENEWABLES Marex carried out a review of all documentation for the installation of the topsides of the DolWin Alpha Offshore HVDC Platform, with operational recommendations for involvement by all stakeholders. SAFETY CASE DEVELOPMENT Over…
HUBER+SUHNER have been awarded "best supplier" in the innovation category for its MASTERLINE Extreme Hybrid cabling system by a leading mobile communication equipment company. Urs Ryffel, COO of Fiber Optics Division, was presented with…
Cygnus ultrasonic thickness gauge has been proven to read through coatings of Oxifree TM198 which is used to protect metal by preventing moisture and particle ingress... READ MORE >
Advantages of Nylacast Sheaves Using advanced polymers, in particular those based around cast nylon, allow for a number of significant advantages in sheave application. These included increased wire rope life, reduced component weight, protection…
Westermost Rough Project – A Case Study Route preparation and boulder clearing project on Westermost Rough Wind Farm. 33 routes cleared in high currents on spring as well as neap tides. 20m corridor required.…
Forties Field We have carried out 2 major projects on the Forties Alpha and Forties Delta, both projects used 26" x 1" WT Conductor and to enhance the depth of drive CIS supplied "Deep…
Egyptian Electricity Transmission Company (EETC) suffered fibre breaks on an existing OPGW network which spanned the Suez Canal. The OPGW cable provided a crucial strategic fibre optic link between the main cities of Egypt…