The Romanian oil and gas producer Petrom needed to guide a new conductor away from existing platform conductors. CIS aided the installation process by using a bespoke deviated directional drive shoe. This avoided a…
In a full turnkey operation for a conductor installation project in Tunisia for Houston-based Atlas Petroleum Group, CIS provided engineering assistance (in collaboration with a fellow Acteon company) and provided and installed three strings…
AFL handled the voice over IP (VoIP) conversion for four locations of Wells Fargo Bank’s Call Center which included 500 to 1,700 users per location. READ MORE >
CIS supplied the personnel and equipment to batch drive three 30inch x 1inch conductors from a jack-up installation offshore Indonesia. The S-90 hammer and associated equipment were supplied from the CIS operations base in…

Case Studies

March 04, 2016
Intergraph_CADWorx_CaseStudy_Gelsia_Italy_Final_SCREEN.pdf   CaseStudy-TheBadgerCompany_CADWorx_fieldPipe_FINAL_SCREEN.pdf   CaseStudy_-_MARSON_3D-ISAGRO_SCREEN_FINAL.pdf   Case_Study_GazpromNeftOmsk_final.pdf   EnBW_Casestudy_FINAL.pdf   CaseStudy-_ECOFOX_Final.pdf   Intergraph_CADWorx_CAESAR_II_CaseStudy_SAFE_Final.pdf   Case_Study_NEOLANT_SCREEN.pdf   Mahler_CaseStudy_CADWorx_CAESARII_SCREEN.pdf   Case_Study_LUDAN_FINAL_WEB.pdf   CaseStudy-_Nortech-FINAL_SCREEN.pdf   OnLineDesignEngineering_CaseStudy_CAESARIIPV-Elite_NozzlePro_SCREEN.pdf    
CIS recently worked with several companies in East Africa  to design and build a land frame to enable the offline installation of 30" to 20" x 1" WT conductors.  The land frame enabled  CIS to…
Thanks to our focus on the region, major operators have been able to use the entire spectrum of services from CIS to install conductors ranging from 20” through to 30”. Several customers in the…

Geophysical Survey

March 27, 2014
The Owers Bank dredging area lies approximately 8 nautical miles offshore Littlehampton on the south coast of England, UK.  The sites surveyed are located within this licensed dredging area and are referred to as…
AFL provided structured cabling installation management and performed all terminations to achieve a certified copper and fiber network with a 25-year warranty. AFL also took on the task of installing, terminating and certifying the…
BG Group India has been working with CIS since the company was founded in 2005. In the intervening time, CIS has carried out over 80 projects the company – all of which have been…