Drive Shoes After supplying BP Exploration with a range of conductor drive chasers (XLC-S connection) for a project in Trinidad and Tobago, CIS received a special commendation for its overall conductor driving set-up. BP…
Case Study: Launch & Recovery Systems The offshore industry is beset by challenges, harsh environment, weight penalties and difficult maintenance opportunities. The introduction of Engineered Polymers can deliver significant performance advantages and lifetime cost…
CIS maintains an operational base in Lafayette with a full complement of quality equipment and experienced personnel for all types of conductor and pile driving operations. The workshop has the facility for the fabrication…
Cygnus ultrasonic thickness gauge has been proven to read through coatings of Oxifree TM198 which is used to protect metal by preventing moisture and particle ingress... READ MORE >

Case Study

January 07, 2016
Apache North Sea Forties Project   Introduction Tata Steel helped oil and gas company Apache North Sea win a race against time by delivering urgently needed coated line pipe as part of the customer’s…
Roman Zenger, a polymechanic in the 4th year of his apprenticeship, achieved an excellent fourth place in the discipline polymechanic/CNC milling at the Swiss Vocational Skills Championships (SwissSkills) from 18 to 21 September 2014.…
AFL provided structured cabling installation management and performed all terminations to achieve a certified copper and fiber network with a 25-year warranty. AFL also took on the task of installing, terminating and certifying the…
CIS has worked in Gabon for a number of years and has built up an impressive catalogue of successful operations during this time. Conductor sizes installed range from 30" x 1" to 20" x…
In a full turnkey operation for a conductor installation project in Tunisia for Houston-based Atlas Petroleum Group, CIS provided engineering assistance (in collaboration with a fellow Acteon company) and provided and installed three strings…
CIS was asked to drive anchor piles in 30 metres of water. Following a series of discussions it was agreed to use an extended drive-chaser and to hammer the piles from a vessel, thus…