Intergraph_CADWorx_CaseStudy_Gelsia_Italy_Final_SCREEN.pdf   CaseStudy-TheBadgerCompany_CADWorx_fieldPipe_FINAL_SCREEN.pdf   CaseStudy_-_MARSON_3D-ISAGRO_SCREEN_FINAL.pdf   Case_Study_GazpromNeftOmsk_final.pdf   EnBW_Casestudy_FINAL.pdf   CaseStudy-_ECOFOX_Final.pdf   Intergraph_CADWorx_CAESAR_II_CaseStudy_SAFE_Final.pdf   Case_Study_NEOLANT_SCREEN.pdf   Mahler_CaseStudy_CADWorx_CAESARII_SCREEN.pdf   Case_Study_LUDAN_FINAL_WEB.pdf   CaseStudy-_Nortech-FINAL_SCREEN.pdf   OnLineDesignEngineering_CaseStudy_CAESARIIPV-Elite_NozzlePro_SCREEN.pdf    
CIS has driven In excess of 30 twenty inch and twenty-six inch conductors offline in land operations for a major operator in Congo during 2009 and 2010, with additional twenty-four inch conductors being driven…
CIS maintains a permanent operations base in Singapore to support our growing markets in the Far East. Peter Kilian, Sales and Operations Manager, Asia and Pacific, heads up this base. The base has completed…
What applications did Bibby have in mind when they purchased the Atom? Although primarily the Atom has been aimed at the light construction market, Bibby intend to cover survey, drill support and IRM with…
CIS recently completed a very demanding project in Australasia. The project was in a remote jungle location and involved the installation of some sixty 48-in. and ninety 18-in. steel foundation piles for two wharfs…
Thanks to our focus on the region, major operators have been able to use the entire spectrum of services from CIS to install conductors ranging from 20” through to 30”. Several customers in the…
CIS have provided technical support personnel to assist with the driving of piles for a jacket installation offshore Turkey. Two 42inch x 1.5inch piles were driven with a S-150 hammer as part of a…
Westermost Rough Project – A Case Study Route preparation and boulder clearing project on Westermost Rough Wind Farm. 33 routes cleared in high currents on spring as well as neap tides. 20m corridor required.…

Russia

May 06, 2015
The energy sector in Russia provides big and continuing opportunities for agencies and international consultants. Head of the Russian Ministry of Energy, Alexander Novak, anticipated further oil and gas production growth in 2014. However,…
Osiris Projects successfully completed a full geophysical and geotechnical programme in the German Bight for regular clients TenneT Offshore GmbH. The original scope of the project involved 66 vibrocore and CPT stations and more…