CIS was asked to drive anchor piles in 30 metres of water. Following a series of discussions it was agreed to use an extended drive-chaser and to hammer the piles from a vessel, thus…

Cable Route Survey

March 27, 2014
The survey area comprised three separate locations. Firstly, the Welsh inshore section of the project, secondly the Irish inshore section and thirdly the route development work. The main objectives of the survey were as…
Aquasign

Case Studies

August 13, 2014
Aquasign do not have any case studies at the moment. To find out more about Aquasign please visit http://www.aquasign.com/en/
The Romanian oil and gas producer Petrom needed to guide a new conductor away from existing platform conductors. CIS aided the installation process by using a bespoke deviated directional drive shoe. This avoided a…
The site is situated in the central North Sea, approximately 30km southeast of Montrose on the southeast coast of Scotland.  The main objectives of the survey were to: Acquire data that conforms to IHO…
CIS recently completed a very demanding project in Australasia. The project was in a remote jungle location and involved the installation of some sixty 48-in. and ninety 18-in. steel foundation piles for two wharfs…