Around 4.5 million passengers use the metro every day to travel around the city of São Paulo. State-of-the-art train control and safety systems, such as the communication-based train control (CBTC) system, are used to…

Geophysical Survey

March 27, 2014
The Owers Bank dredging area lies approximately 8 nautical miles offshore Littlehampton on the south coast of England, UK.  The sites surveyed are located within this licensed dredging area and are referred to as…
CIS has driven In excess of 30 twenty inch and twenty-six inch conductors offline in land operations for a major operator in Congo during 2009 and 2010, with additional twenty-four inch conductors being driven…
AFL completed a complex and time-critical fibre optic installation project for a major power network situated in the Andes Mountains in central Peru. Given the remote location of the installation site and the pending…
Laggan Tormore Project – A Case Study Route preparation and bouldering clearing project. SCAR Seabed System completed a 67km, 10m wide swathe in 6 days operating in water depths greater than 600m. The system…
CIS provided personnel and an S-90 hammer to assist in a drive-drill-drive project that consisted of installing thirty 1056mm OD piles for the extension of an existing fuel terminal in Panama. While six of…