CIS recently worked with several companies in East Africa  to design and build a land frame to enable the offline installation of 30" to 20" x 1" WT conductors.  The land frame enabled  CIS to…
Rampion Offshore Wind Farm The main objectives of the geophysical survey were as follows: To provide an accurate bathymetric chart of the site extension; To chart natural seabed features and any obstructions, manmade objects,…
CIS provided a pair of S-150 hammers to assist in the installation of a replacement oil loading and offloading terminal in 90 feet of water offshore Grand Bahama. The ground contained difficult-to-drill hard horizons…
AFL provided a Cat6 structured cabling network infrastructure for a new five story, 120,200 square-foot general classroom and office building facility for the University of North Carolina at Greensboro (UNCG) School of Education. READ…
RENEWABLES Marex carried out a review of all documentation for the installation of the topsides of the DolWin Alpha Offshore HVDC Platform, with operational recommendations for involvement by all stakeholders. SAFETY CASE DEVELOPMENT Over…
Case Study: Launch & Recovery Systems The offshore industry is beset by challenges, harsh environment, weight penalties and difficult maintenance opportunities. The introduction of Engineered Polymers can deliver significant performance advantages and lifetime cost…