yourindustryprofile

October 02, 2015

Ecosse Subsea Case Studies- Laggan Tormore Project

Laggan Tormore Project – A Case Study

  • Route preparation and bouldering clearing project.
  • SCAR Seabed System completed a 67km, 10m wide swathe in 6 days operating in water depths greater than 600m.
  • The system was launched and placed on the seabed in 3m Sig. Waves.
  • No tool downtime on the project.
  • SCAR operated through a variety of seabed conditions including:- soft sands, hard to soft clays, gravels & mega-ripples.