CIS have provided specialist technical personnel to support underwater hammer operations for pile driving from a boat offshore Norway. By providing skilled personnel, CIS's conductor experience can help clients to ensure a successful installation.

Geophysical Survey

March 27, 2014
The main objective of the survey was to acquire a high resolution data set for the evaluation of aggregate resource assessment prior to geotechnical investigations. This included the acquisition of accurate 100% coverage bathymetry,…

Case Studies

March 04, 2016
Intergraph_CADWorx_CaseStudy_Gelsia_Italy_Final_SCREEN.pdf   CaseStudy-TheBadgerCompany_CADWorx_fieldPipe_FINAL_SCREEN.pdf   CaseStudy_-_MARSON_3D-ISAGRO_SCREEN_FINAL.pdf   Case_Study_GazpromNeftOmsk_final.pdf   EnBW_Casestudy_FINAL.pdf   CaseStudy-_ECOFOX_Final.pdf   Intergraph_CADWorx_CAESAR_II_CaseStudy_SAFE_Final.pdf   Case_Study_NEOLANT_SCREEN.pdf   Mahler_CaseStudy_CADWorx_CAESARII_SCREEN.pdf   Case_Study_LUDAN_FINAL_WEB.pdf   CaseStudy-_Nortech-FINAL_SCREEN.pdf   OnLineDesignEngineering_CaseStudy_CAESARIIPV-Elite_NozzlePro_SCREEN.pdf    
Three projects have been carried-out in Dubai in conjunction with CIS's sister company, Claxton. The projects have been full-slot recovery with CIS providing the 24" Conductor Installation Services including full running/handling tools and all…
CIS recently worked with several companies in East Africa  to design and build a land frame to enable the offline installation of 30" to 20" x 1" WT conductors.  The land frame enabled  CIS to…
The MIGROS industrial enterprise Midor AG relies on HUBER+SUHNER's expertise for the fiber optic infrastructure of its IT networks. HUBER+SUHNER delivered MASTERLINE cables, cable sealing boxes and various other fiber optic cables for connecting…

Cable Route Survey

March 27, 2014
The survey area comprised three separate locations. Firstly, the Welsh inshore section of the project, secondly the Irish inshore section and thirdly the route development work. The main objectives of the survey were as…
CIS has been awarded the largest contract in its history for operations in Nigeria. The USD multi-million dollar contract requires CIS to provide a range of conductor installation services in Nigeria on behalf of…
AFL was selected from a group of pre-qualified contractors to install the communications infrastructure for the Interdisciplinary Science Teaching and Research Facility (ISA) located on the University of South Florida (USF) campus. The ISA facility was designed…

Case Study

January 07, 2016
IntroductionAngola is firmly established as a global hub of the hydrocarbon industry, with conservative estimates putting the country’s oil reserves at around 10 billion barrels. Tata Steel’s contract for the Malongo Terminal Oil Export…