CIS has successfully completed two conductor driving operations in Cameroon. Both operations utilised the CIS S-90 hammer (mobilised from our extensive fleet)  to drive 30 inch x 1 inch pipe with Drillquip H60N and…
AFL provided the solution and manpower to relocate a strategically-positioned equipment cabinet that was a critical component of the facility‚Äôs data infrastructure. ATI Allvac, an Allegheny Technologies company, is a world leader in the production…
CIS provided personnel and an S-90 hammer to assist in a drive-drill-drive project that consisted of installing thirty 1056mm OD piles for the extension of an existing fuel terminal in Panama. While six of…
RENEWABLES Marex carried out a review of all documentation for the installation of the topsides of the DolWin Alpha Offshore HVDC Platform, with operational recommendations for involvement by all stakeholders. SAFETY CASE DEVELOPMENT Over…
Rampion Offshore Wind Farm The main objectives of the geophysical survey were as follows: To provide an accurate bathymetric chart of the site extension; To chart natural seabed features and any obstructions, manmade objects,…
HUBER+SUHNER has been chosen to supply Thales with a range of trackside and on-board antennas and cables to support the CBTC (Communications Based Train Control) system on the New York City Subway. CBTC enables…
AFL provided a Cat6 structured cabling network infrastructure for a new five story, 120,200 square-foot general classroom and office building facility for the University of North Carolina at Greensboro (UNCG) School of Education. READ…
Advantages of Nylacast Sheaves Using advanced polymers, in particular those based around cast nylon, allow for a number of significant advantages in sheave application. These included increased wire rope life, reduced component weight, protection…
  CIS have provided technical support personnel to assist in the driving of conductors in 21 slots in Azerbaijan. The majority of these installations have utilised our S-150 hammers driving 30inch x 1.5inch pipe.…
CIS have successfully completed a number of conductor installations in the Southern North Sea from their operating base in Great Yarmouth. These have included the installation of 36inch x 2inch jacket docking piles through…